LIFTING & MOVING

BRIDGE TRANSPORT AND INSTALLATION

PHOTO DETAILS

REPRESENTATIVE

CLIENT DAEWOO E&C / KOREA SCAFFOLDING
BUSINESS NAME INDIA MUMBAI OFFSHORE SECTION 2 BRIDGE CONSTRUCTION
CONSTRUCTION SCALE 54 MONTHS AFTER THE START OF CONSTRUCTION
CONSTRUCTION PERIOD 54 MONTHS AFTER THE START OF CONSTRUCTION
BUSINESS INFORMATION

1) REVIEW OF SUPPLEMENTATION AND REVISION OF BASIC CONSTRUCTION METHOD

2) REVIEW OF DESIGN CONDITIONS, WORKING CONDITIONS, AND ENVIRONMENTAL CONDITIONS

3) REVIEW OF EQUIPMENT SELECTION FOR TRANSPORTATION AND CONSTRUCTION

4) SPMT TRANSPORTATION PLAN

5) LOADING RAMP-WAY DESIGN

6) BARGE MOORING/BALLAST PLAN

7) BARGE STRENGTH CHECK

8) BARGE DECK GRILLAGE DESIGN

9) SEA-TRANSPORTATION MOTION ANALYSIS

10) SEA-FASTENING DESIGN

11) BARGE STABILITY CHECK

12) BARGE TOWING PLAN

13) BARGE MOORING PLAN FOR BLOCK INSTALLATION

14) GIRDER BLOCK LIFTING PLAN (MEGA JACK SYSTEM)

15) GIRDER STRENGTH & DEFLECTION CHECK

16) GIRDER LOCAL STRENGTH CHECK

17) LOCAL REINFORCEMENT DESIGN

18) BARGE BALLAST PLAN FOR BLOCK LIFTING

19) BARGE DYNAMIC ANALYSIS BY MOSES

20) TECHNICAL SUPPORT FOR OVERSEAS DISPATCH OF HIGH-LEVEL PERSONNEL AND BUSINESS RESPONSE

SUB PERFORMANCE

NO. CLIENT BUSINESS NAME CONSTRUCTION PERIOD BUSINESS INFORMATION PHOTO DETAILS
1 SAMHWAN ENTERPRISES / SUNGCHANG INDUSTRIAL GWANGAN BRIDGE SECTION 2 SUSPENSION BRIDGE TEMPORARY CONSTRUCTION TRUSS MARINE TRANSPORTATION 2001/07 ~ 2002/04

1) REVIEW OF TRANSPORT EQUIPMENT

2) SEA FASTENING DESIGN

3) LOADING AND UNLOADING DESIGN

4) REVIEW OF THE GROUND ASSEMBLY METHOD

2 HYUNDAI E&C KUWAIT BRIDGE CONSTRUCTION PYLON FOUNDATION LIFTING ENGINEERING 2014/08 ~ 2015/02

1) PYLON PC HOUSE SALVAGE, TRANSPORTATION AND INSTALLATION TECHNOLOGY SERVICE

2) PC HOUSE TRANSPORT BARGE REINFORCEMENT DESIGN

3) 60M PC BOX GIRDER TRANSPORT BARGE REINFORCEMENT DESIGN

4) FLOATING CRANE TOWING STABILITY CHECK

3 HYUNDAI E&C GOHA BAMBOO BRIDGE YEONGYO ISLAND CAISSON INSTALLATION CONSTRUCTION 2006/12 ~ 2007/01

1) CAISSON SEA TRANSPORTATION ENGINEERING

2) STOWAGE PLAN & SEA FASTENING

3) LIFTING BEAM DESIGN

4) STRUCTURAL STRENGTH REVIEW

5) MOORING PLAN & WORKING PROCEDURE

4 HYUNDAI E&C / HANGJIN DEVELOPMENT / CHANGWU MARINE MACHANG BRIDGE TEMPORARY CONSTRUCTION WELL BARREL LIFTING AND INSTALLATION ENGINEERING 2005/04 ~ 2005/05

1) REVIEW OF PC HOUSE SALVAGE PLAN

2) REVIEW OF LIFTING EQUIPMENT SPECIFICATIONS

3) DESIGN OF LUGS FOR LIFTING

5 DAELIM CONSTRUCTION ABHAE BRIDGE CAISSON SALVAGE AND INSTALLATION WORK 2001/10 ~ 2001/12

1) SALVAGE TOOL STRUCTURAL ANALYSIS

2) REVIEW OF LIFTING STABILITY

6 HYUNDAI E&C / SAMJIN INDUSTRIAL NEW INDUSTRIAL RAILWAY TEMPORARY CONSTRUCTION IN THE SOUTHWEST REGION BRIDGE BOX CONSTRUCTION ENGINEERING 2001/06 ~ 2001/10

1) SELECTION OF TEMPORARY EQUIPMENT

2) REVIEW THE HYPOTHESIS METHOD

3) TEMPORARY STRUCTURE DESIGN

4) PREPARATION OF CONSTRUCTION SPECIFICATIONS