CLIENT | HUTA (SAUDI) |
BUSINESS NAME | KAP PROJECT CONCRETE BLOCK SALVAGE |
CONSTRUCTION SCALE | 2011/10 ~ 2013/01 |
CONSTRUCTION PERIOD | 2011/10 ~ 2013/01 |
BUSINESS INFORMATION |
1) 1500TON / 700TON CONCRETE BLOCK LIFTING FRAME DESIGN 2) FABRICATION OF LIFTING FRAME & FORWARDING 3) FRAME ASSEMBLY AT SITE TEST |
NO. | CLIENT | BUSINESS NAME | CONSTRUCTION PERIOD | BUSINESS INFORMATION | PHOTO DETAILS |
1 | DAEWOO SHIPBUILDING & MARINE ENGINEERING / GEOSUNG TECH | OFFSHORE CRANE TENSION JIG STRENGTH ANALYSIS | 2007/03 | 1) 3600TON TENSION JIG BLOCK STRENGTH ANALYSIS 2) PREPARATION OF CLASSIFICATION APPROVAL DOCUMENTS |
|
2 | YUJIN MECHATRONICS | UPENDING & LIFTING TOOL | 2017/09 ~ 2017/10 | 1) CONCEPT AND DESIGN 2) USAGE PROCEDURE 3) STRUCTURAL STRENGTH REVIEW 4) SUBMISSION OF ANALYSIS REPORT |
|
3 | YUJIN MECHATRONICS | VVTS IB/OB SECTOR HANDLING TOOL | 2019/10 ~ 2019/12 | 1) LIFTING FRAME DESIGN 2) STRUCTURE ANALYSIS 3) ANALYSIS REPORT |
|
4 | KTT Plant | SPREADER BEAM FOR MTBE TANK | 2019/10 ~ 2019/12 | 1) LIFTING FRAME DESIGN 2) STRUCTURE ANALYSIS 3) ANALYSIS REPORT |
|
5 | KUMGANG INDUSTRIAL MACHINERY | 1500 TON CLASS GUIDE FRAME DESIGN | 2007/08 ~ 2007/11 | 1) BASIC DESIGN OF GUIDE FRAME 2) STRUCTURAL STRENGTH REVIEW |
|
6 | DAEWOO SHIPBUILDING & MARINE ENGINEERING / DAEKYUNG HEAVY INDUSTRIES | 500 TON HOIST BLOCK FOR INSTALLATION OF SUBMERGED SHIP ON GEOGA BRIDGE | 2007/03 ~ 2007/04 | 1) STRENGTH ANALYSIS 2) STRUCTURAL DESIGN SUPPORT |
|