LIFTING & MOVING

TANKER

PHOTO DETAILS

REPRESENTATIVE

CLIENT KTT PLANT
BUSINESS NAME MIXED FEED CRACKER PROJECT BALL TANK TRANSPORT ENGINEERING
CONSTRUCTION SCALE 2019/03 ~ 2019/04
CONSTRUCTION PERIOD 2019/03 ~ 2019/04
BUSINESS INFORMATION

1) TRANSPORT CONCEPT DESIGN

2) CONDUCTION REVIEW DURING TRANSPORTATION

3) FINITE ELEMENT MODELING AND STRUCTURAL ANALYSIS

4) REACTION CHECK

5) TECHNICIAN APPROVAL

6) STRUCTURAL ANALYSIS REPORT PREPARATION

SUB PERFORMANCE

NO. CLIENT BUSINESS NAME CONSTRUCTION PERIOD BUSINESS INFORMATION PHOTO DETAILS
1 SHINHEUNG INDUSTRY STORAGE TANK T-001 MINIMUM THICKNESS REVIEW 2020/06

1) CALCULATION OF MINIMUM THICKNESS OF PRESSURE VESSEL AND DRAWING OF CONCEPT

2 DAEWOO LOGISTICS PARADIP REFINERY PROJECT PRESSURE VESSEL SEA TRANSPORT 2011/01 ~ 2011/09

1) SEA TRANSPORTATION ENGINEERING